Author: challenger

Unit Layout

Less than 10,500 SF  is required for the unit and tanks Water Purification Steps Page a. Step 1: Oil & Waste Water Separation b. Step 2: Ozone Pre-Treatment c. Step 3: Solids Filtration d. Step 4: Media Filtration e. Step 5: UV Treatment

Peer Study

The recycling of produced water and oilfield waste from unconven- tional oil and gas development (UD) has recently garnered significant attention given the scarcity of fresh water in many shale energy basins across the United States. For example, in 2011, 18.5 billion liters of water…